Silver Tower, Burnaby BC

Silver Tower

Silver Tower

6333 Silver Avenue, Burnaby, BC

One of the newest towers to go up in the thriving Metrotown area, The Silver is a prime example of the range of ATLAS’ abilities. We have incorporated a davit system into The Silver to facilitate scheduled and unscheduled building maintenance operations. Rooftop maintenance operations at the lower podium levels has been accomplished with a combination of horizontal lifelines at the perimeter gardens and single point pedestal anchors on the green roofs.

Applications:

  1.  Roof Top Maintenance
  2.  Scheduled Exterior Building Maintenance
  3.  Unscheduled Exterior Building Maintenance

Products:

  1. Fall Arrest and Restraint Anchors
  2. Horizontal Lifeline Systems
  3. Davit System
  4. Stabilization System
Read more

Queens Park Arena, New Westminster BC

Queens Park HLL

Queens Park Arena

220 First Street, New Westminster, BC

ATLAS was retained by City of New Westminster to propose a fall protection solution to facilitate rooftop maintenance operation of Queen Park Arena during roof replacement. The roof of Arena has been framed with wooden structures.

ATLAS’s scope of work included designing, manufacturing, installation and certification of a complete fall Protection System, In addition, ATLAS also provided structural engineering service as Engineer of Record, for the reinforcement of existing wooden members to support Fall Protection system – HLL above. The project was constructed in the Spring of 2014.

Application:

  1. Roof Top Maintenance

Products:

  1. CST-9100-4R
  2. Pass Through Horizontal Lifeline
Read more

Main Street Skytrain Station, Vancouver BC

Main Street Station Rendering

Main Street Skytrain Station

1339 Main Street, Vancouver, BC

Main Street-Science World Station is the oldest station on Translink’s rapid transit system. The Station had long been recognized as a priority for upgrades. ATLAS has installed a multitude of pedestal and wall mounted anchorages in combination with horizontal lifelines to allow for workers to safely work and carry out these upgrades on the Station. Working with the general contractor and following Translink’s and ATLAS’ safety procedures, all the work was required to be done in the middle of the night when the trains are not running. Just another example of ATLAS’ ability to get the work done safely and properly, regardless of circumstance.

 Application:

  1. Roof Top Maintenance
  2. Transportation and Loading Facilities

Products:

  1. Fall Arrest and Restraint Anchors
  2. Horizontal Lifeline Systems (HLLs)
Read more

Caltrax, Calgary AB

Caltrax

Caltrax

ATLAS designed an HLL system to service the top of railcars along the 231’ catwalk. Design included additional structural members to be added to the base structure in order to meet loading criteria of the fall protection system. The overhead horizontal lifeline system needed to be engineered to accommodate four simultaneous users.

Application:

  1. Transportation and Loading Facilities

Product:

  1. Fall Arrest and Restraint Anchors
  2. Horizontal Lifeline System (HLL)
Read more

Vibe Lofts, Edmonton, AB

Vibe Lofts

Vibe Lofts

10604 116th Street, Edmonton, AB

Developed by Carrington Communities – Edmonton’s largest builder, and managed by Cityscape Property Management, Vibe Lofts is a 196-unit rental property ranging from 523 sf to 1056 sf. The 6-storey cast-in-pace concrete and steel condo resides in the bustling neighborhood of Queen Mary Park in downtown Edmonton. The small but trendy condos are for those who want downtown lifestyle without the high price tag.

Atlas worked with the developer team to ensure a functional solution within the budget.

Applications:

  1. Building Roof top Maintenance (RTM)
  2. Scheduled Exterior Building Maintenance

Products:

  1. Fall Arrest and Restraint Anchors
Read more

Groves of Varsity, Calgary AB

Groves-of-Varsity

Groves of Varsity

5353 Crowchild Trail NW

The Groves of Varsity is a steel and concrete building in the heart of Calgary’s award winning Northwest community called Varsity. It features a central courtyard, water features, walking paths, LRT access and extensive surrounding shopping areas. The community offers beautifully designed suites with comfortable senior living in mind, and the Lifestyle offers a wide range of services and amenities that allow its senior resident members to preserve their independence.

Atlas faced access challenges for the install of the rope guides at eyebrow\cornice locations which required the use of a Boom Lift. Atlas installed systems on all of the buildings at the Grove.Applications:

  1. Building Roof top Maintenance (RTM)
  2. Scheduled Exterior Building Maintenance

Products:

  1. Fall Arrest and Restraint Anchors
Read more

Christ Church Cathedral – Vancouver, BC

Christ Church Cathedral, Vancouver

Christ Church Cathedral

690 Burrard Street, Vancouver

The Anglican cathedral is Vancouver’s oldest surviving church. It opened in 1889 and was used as a landmark for ships entering Vancouver harbour. Since 2004 there has been $12.5 million spent on the cathedral to renew and restore the fabric of the building. The steel and stained glass BELL TOWER, located on the northeast side of the Anglican cathedral, is the centerpiece of a $7.5-million renovation to the historic building at Georgia and Burrard.

Atlas worked with the designers and fabricators of the BELL TOWER, to design and install a Permanent Fall Protection System combining Atlas Single Point Spiral anchors along with a (Pre-Manufacturered) Flexible Cable Ladder Safety System to protect workers climbing the BELL TOWER ladder and working within.

Applications:

  1. Scheduled Exterior Building Maintenance

Products:

  1. Fall Arrest and Restraint Anchors
  2. Vertical Lifeline System (HLL)
Read more

Evolution Phase II – Pulse, Calgary AB

Evolution Pulse

Evolution Phase II – Pulse

518 6th Ave SE, Calgary AB
Developed by Vancouver’s Embassy BOSA, the three-phase riverfront project – “Evolution” – encompasses high-rise and mid-rise condominium towers, town homes and street-level retail, on the East Village area in Calgary. With an estimated value of $325 million, Evolution will comprise approximately 730,000 square feet of mixed-use development including 600+ residential units.
PULSE, the Evolution’s second phase, is a 33 stories tower built between 2013 and 2016.

Applications:

  1. Building Roof top Maintenance (RTM)
  2. Scheduled Exterior Building Maintenance
  3. Unscheduled Exterior Building Maintenance

Products:

  1. Fall Arrest and Restraint Anchors
Read more

Manitoba Hydro, Winnipeg MB

Manitoba Hydro

Manitoba Hydro

820 Tylor Ave, Winnipeg MB

Constructed between 1957 and 1958, this L-shape 60,000 square feet towering structure was originally constructed as a head office for the newly created Manitoba Hydro Electric Board established in 1953. The company became Manitoba Hydro in 1961, a crown corporation of the government of Manitoba. Subsequently, in 1963, the Manitoba Power Commission (MPC) amalgamated and all 375 staff relocated to this building.

Applications:

  1. Building Roof top Maintenance (RTM)
  2. Scheduled Exterior Building Maintenance
  3. Unscheduled Exterior Building Maintenance

Products:

  1. Fall Arrest and Restraint Anchors
  2. Horizontal Lifeline System (HLL)
Read more
Hotel Vancouver

Fairmont Hotel Vancouver, Vancouver BC

Hotel Vancouver

Fairmont Hotel Vancouver

900 West Georgia Street, Vancouver

Fairmont Hotel Vancouver is known as the ‘Castle in the City’ and reflects timeless luxury and history of Vancouver. Constructed at 111 metres (17 stories) high, it became part of the Canadian Pacific Hotels chain after that company purchased CN Hotels in 1988. CP Hotels was later purchased by Fairmont Hotels and Resorts, and this building is the third hotel to be named “Hotel Vancouver”.

Atlas developed and installed permanent equipment to meet OHS Regulations, in conjunction with Owner Representatives and contractors performing major renovations. This allows window washing, exterior building maintenance and seasonal lighting operations to occur.

Challenges included the discovery and adaption to deal with the various building materials and structure implemented over the building’s unique history of the past century. Continued installations occur as portions of building are changed, renovated and modernized.Applications:

  1. UnScheduled Interior Building Maintenance
  2. Building Roof top Maintenance (RTM)
  3. Unscheduled Exterior Building Maintenance

Products:

  1. Fall Arrest and Restraint Anchors
Read more